Following is a list of the most common forms we use. These forms may be downloaded for your convenience. Some of them must be notarized. This can be done in our office or by any NC Notary Public.
This form can be filled out to state that your contractor has voluntarily left your project or that he has been dismissed. This form will need to be notarized.
|
Download: Affidavit for Dismissal of Your Contractor |
|
|
Download: Affidavit for Contractor Who Resigns Project |
|
This sheet can be filled out and brought in when you are ready for your permit. It lists all the pertinent information we will need to know.
|
Download: Residential Building Permit Application for New Construction |
|
|
Download: Residential Building Permit Application for Remodel/Addition |
|
|
Download: Electrical Permit |
|
|
Download: Heating & Air (Mechanical) Permit |
|
|
Download: Plumbing Permit |
|
Your commercial plans must be reviewed by our Commercial Plan Reviewer. As this takes 3 - 5 days, please plan your schedule accordingly. If your plans are not detailed enough, he may ask you to fill out an Appendix B.
|
Download: Commercial Building Permit Form |
|
|
Download: Commercial Building Permit Form for Signs Only |
|
|
Download: Appendix B |
|
Before your Certificate of Occupancy (CO) can be issued, your project must pass final inspection. We have a "Final Inspection Request" form that must be filled out and returned to our office the day prior to your scheduled inspection. Please note that if your are building anything with wood, NC Code requires that it be treated for termites. We must have verification of the chemical used and concentration from your pest control company. They will fax us this information at your request. Also, if you are in the Town of Lake Lure, we must have verification that your project has been released from their Zoning Administrator. You may want to contact that department a week or two before scheduling your final.
|
Download: Inspections for your House |
|
|
Download: Final Inspection Request |
|
This form is used to purchase a separate electrical permit for power. This is not a temporary electrical for initial building. This is 30 days of electricity in order to finish the building and is $75. This form must be notarized.
|
Download: Test In Construction |
|
|
Download: Mobile Home Permit Application |
|
This form is used to test for soil compaction.
|
Download: Soil Test Information |
|
|
Download: Inspection of Mobile Home |
|
Most of our documents are "public record," meaning that the public may peruse them. However, we do request 24-hour notice for copies or for inspection of any documents. Please fax, mail, or drop the following form to our office with the requested information noted.
|
Download: Written Request For Public Information |
|